Flanged Cnc
Flanged Cnc
![]() |
![]() 20mm CNC Flanged Shaft Support Supporter Block US $14.90
|
![]() 20mm Square Flanged CNC Router Linear Motion Bushing US $24.90
|
![]() 40mm Square Flanged CNC Router Linear Motion Bushing US $83.94
|
![]() 30mm Square Flanged CNC Router Linear Motion Bushing US $59.94
|
![]() 25mm Long Square Flanged CNC Linear Motion Bushing US $47.94
|
![]() 20mm Long Square Flanged CNC Linear Motion Bushing US $35.94
|
![]() 12mm Long Square Flanged CNC Linear Motion Bushing US $29.94
|
![]() 8mm Long Square Flanged CNC Linear Motion Bushing US $29.94
|
![]() 25mm Round Flanged CNC Linear Motion Long Bushing US $41.94
|
![]() 20mm Round Flanged CNC Linear Motion Long Bushing US $35.94
|
![]() 16mm Round Flanged CNC Linear Motion Long Bushing US $35.94
|
![]() 12mm Round Flanged CNC Linear Motion Long Bushing US $29.94
|
![]() 8mm Round Flanged CNC Router Linear Motion Long Bushing US $29.94
|
![]() 12mm Square Flanged CNC Router Linear Motion Bushing US $29.94
|
![]() 8mm Square Flanged CNC Router Linear Motion Bushing US $29.94
|
![]() 8mm Round Flanged CNC Router Linear Motion Bushing US $29.94
|
![]() 16mm Square Flanged CNC Router Linear Motion Bushing US $24.90
|
![]() 16mm Round Flanged CNC Router Linear Motion Bushing US $24.90
|
![]() 30mm CNC Flanged Shaft Support Supporter Block US $19.90
|
![]() 8mm CNC Flanged Shaft Support Supporter Block US $14.90
|
![]() NEW CNC Flanged Collet Tool Bit Holder Chuck US $64.99
|
![]() 25mm Long Square Flanged CNC Router Linear Bushing US $47.94
|
![]() 20mm Long Square Flanged CNC Router Linear Bushing US $35.94
|
![]() 16mm Long Square Flanged CNC Router Linear Bushing US $35.94
|
![]() 12mm Long Square Flanged CNC Router Linear Bushing US $29.95
|
![]() 8mm Long Square Flanged CNC Router Linear Bushing US $29.95
|
![]() 25mm Round Flanged CNC Router Linear Long Bushing US $41.94
|
![]() 20mm Round Flanged CNC Router Linear Long Bushing US $35.94
|
![]() 16mm Round Flanged CNC Router Linear Long Bushing US $35.94
|
![]() 12mm Round Flanged CNC Router Linear Long Bushing US $29.95
|
![]() 8mm Round Flanged CNC Router Linear System Long Bushing US $29.95
|
![]() 25mm Square Flanged CNC Router Linear System Bushing US $47.94
|
![]() 8mm Square Flanged CNC Router Linear System Bushing US $29.95
|
![]() 25mm Round Flanged CNC Router Linear System Bushing US $47.94
|
![]() 8mm Round Flanged CNC Router Linear System Bushing US $29.95
|
![]() 16mm Square Flanged CNC Router Linear System Bushing US $24.95
|
![]() 20mm Square Flanged CNC Router Linear System Bushing US $24.95
|
![]() 20mm Round Flanged CNC Router Linear System Bushing US $24.95
|
![]() 16mm Round Flanged CNC Router Linear System Bushing US $24.95
|
| Powered by phpBay Pro |
Plasma CNC Drill Line Runs Rings Around Standard Equipment
The economy of structural steel fabrication is very dependent on the path the workpiece travels as it goes from raw steel inventory to eventual loading on a truck headed for the job site. Every time the workpiece is "touched" adds delay and cost to the final finished beam, channel or angle.
A beam with ten or so bolt holes and cut to length has really very few "touches" . But many fabricated sections are considerably more complicated than that.
For example, complete fabrication recently performed on an 96" W16x31 structural beam involved three dozen unique operations:
* Front Trim Miter Cut 1/4"
* 2 Copes on the front of the beam
* 3 Bolt Holes on that same end of the beam
* 6 bolt hole angled cluster on web
* 4 layout marks on web
* 2 bolt holes on top flange
* 2 bolt holes on bottom flange
* 3 slots on web at rear of beam
* Piece Mark - 2 Lines - 9 characters total
* Flange notch cut flush with web (each end of the beam)
* Cope on rear of beam
* Notch cut on flange
An analysis of fabricating this section by three different "paths" was very revealing in terms of the time requirements that result.
To begin, the "high touch" path is a traditional manual approach. The beam has to be measured and marked, then cut on the bandsaw. After that, there is plenty of "manual" drilling (admittedly using a heavy duty drill press) and significant thermal (torch) cutting to make the copes and flange cuts, in addition to stamping by hand to make the nine letter piece marks. The total time involved to perform these processes was estimated to be 120 minutes - 2 hours. But because of the transport involved and the time in queue at subsequent stations, the clock time would cover at least two shifts - normally two days at most shops.
Second, a more updated and automated approach was used to fabricate the section. This involved cutting the piece to length on the bandsaw, then shuttling it to a beam drill line to make the thirteen bolt holes and three slots. The newer CNC drill lines can probe the steel section to determine location and dimensions, then put the holes according to instructions determined by specialized software. The remaining features have to be measured and marked on the beam before cutting. Then cutting is done by hand coping torch, plate burning machine, and stamping in the piecemark letters. The total time for this approach is 82 minutes. Again, when including the time needed to shuttle the workpiece between stations and time waiting at those stations, the actual clock time totals to take most of a shift.
Then the piece was fabricated on a new and one-of-kind approach. All features were produced on a single machine - a robotic plasma cutting system. Using this approach, there is no use for any measuring or marking. The sensor tip probes the workpiece for position and geometery, then follows its own calculated cutting instructions it calculates from standard software files of the workpiece downloaded into the operator control from programs like TEKLA, SD/2,StruCAD and others.
PythonX starts cutting on the section and doesn't stop until it's done . . . 10 minutes and 13 seconds later. All thirty seven features are fabricated in this time and the beam is completed. There is no time lost in moving the piece or waiting , therefore the time from beginning to completion isn't a day, or a shift . . . it's the time needed for a standard coffee break.
About the Author
Details on this advanced method of structural fabrication can be found at these links exploring the new plasma cutting CNC drill line:
PythonX is the next evolution of the CNC Drill Line
Redefining the Economics of the Beam Drill Line
how much to install turbo?
Hi, I just bought a 94 dodge stealth r/t. I want to put a turbo into due to the fact that the dodge stealth r/t tt's are badass. I was looking around online to buy a whole turbo kit for the car and finally decided on one. its a t3/t4 turbo kit. I have no clue what a t3/t4 kit is lol is it any good? and how much should I bank on a shop charging me to install one? Im not a complete idot when it comes to cars I just am uneducated when it comes to turbos?
heres the specs on the turbo for fyi
3" Inlet Diameter, 2" Outlet Diameter, Compressor : 50 AR, Exducer : 3", Inducer: 2".
Turbine : 63 AR , Exducer: 2.2" inducer: 2.6". Max Up To 35 psi power performance output. CNC Machined flanges, T3/T4 Flange, Max Power: 350HP - 400HP
Should take a shop with all the big boy equipment/tools about 1-2 hrs to put that on so labor cost
But shops are out to make money and don't like it when you bring your own parts so call it 3-4 hours
CNC machining T4 Turbo Oil Drain Flange (high res)


US $14.90





































